Investigação, Desenvolvimento e Inovação · Em Execução

Previsão e Otimização de Flexibilidade Energética em Comunidades de Energias Renováveis

INSTITUTO DE SISTEMAS E ROBOTICA-I.S.R.

Fondo aprobado
212.241,60 €
Fondo ejecutado
42.228,00 €
Fondo pagado
37.380,96 €

Esta ficha organiza los campos que Portugal 2030 publica sobre la operación: financiación aprobada, ejecución administrativa, encuadre y territorio. El mérito de la candidatura y los resultados sobre el terreno no constan en esta fuente.

COMPETE2030-FEDER-00818200

Finalidad de la operación

flexREC aims to develop multi-objective algorithms to manage the charging/discharging of electric vehicles parked in large buildings in a transactive energy context in communities so that the integration of renewable energy is optimized. The project intends to answer four main research questions: • How can EVs be used for providing energy flexibility services for large buildings while simultaneously guaranteeing their autonomy and mobility requirements and compliance with actual regulation? • How can the objectives and preferences of different stakeholders, such as buildings, EV users, the electrical grid and society be ensured when aiming at the optimum integration of PV using EVs as a flexibility resource? • Which algorithms can be used to manage EVs in order to ensure the optimum…

Leer la descripción publicada íntegra

flexREC aims to develop multi-objective algorithms to manage the charging/discharging of electric vehicles parked in large buildings in a transactive energy context in communities so that the integration of renewable energy is optimized. The project intends to answer four main research questions: • How can EVs be used for providing energy flexibility services for large buildings while simultaneously guaranteeing their autonomy and mobility requirements and compliance with actual regulation? • How can the objectives and preferences of different stakeholders, such as buildings, EV users, the electrical grid and society be ensured when aiming at the optimum integration of PV using EVs as a flexibility resource? • Which algorithms can be used to manage EVs in order to ensure the optimum integration of PV, while ensuring coordination with other flexibility resources, such as batteries or Demand Response? • How can artificial intelligence methodologies be used to improve the prediction accuracy of EV requirements at the building level and flexibility at the community level to ensure optimized EV management? • Which methods can be implemented to ensure the aggregation and coordination of EVs’ flexibility for the optimization of the community in a transactive energy context? This project goes beyond the state-of-the-art by: • Implementing a V2B methodology that considers the economic relationship between different entities (the building owner and EV users) with innovative incentive schemes based on the parking period; • Ensuring the management of the V2B system without requiring difficult data to be monitored or estimated by the user; • Ensuring simultaneously the requirements and objectives of buildings and EV users; • Using artificial intelligence to predict EV users’ requirements for several EVs parked in large buildings and collaborative learning to forecast flexibility at the community level; • Ensuring the aggregation of buildings with the coordination of EVs as a flexible resource at the community level; • Implementing transactive energy techniques for community optimization.

Cómo se encuadra la operación

Programa
Programa Inovação e Transição Digital
Fondo
Fundo Europeu de Desenvolvimento Regional
Objetivo estratégico
+ Inteligente
Objetivo específico
Reforçar a investigação, inovação e adoção de tecnologias avançadas.
Área temática
Investigação, Desenvolvimento e Inovação
Actividad económica
Outra investigação e desenvolvimento das ciências físicas e naturais
Modalidad
Subvenção
Tasa de cofinanciación
85%

Distribución territorial publicada

CoimbraRegião de Coimbra · Centro
100% de la localización

Localización observada en el archivo del 31 de octubre de 2026.

Calendario publicado

Inicio previsto
1 de julio de 2025
Inicio efectivo
3 de diciembre de 2025
Conclusión prevista
29 de junio de 2028
Conclusión efectiva
No indicada

Fuente oficial y fechas de corte

Operación e importes: 31 de octubre de 2026. Localización: 31 de octubre de 2026.