Investigação, Desenvolvimento e Inovação · Em Execução

Produção de dsRNAs direcionados a patógenos virais e bacterianos de camarões utilizando a microalga Chlamydomonas reinhardtii

CIIMAR - CENTRO INTERDISCIPLINAR DE INVESTIGAÇÃO MARINHA E AMBIENTAL

Fondo aprobado
193.881,60 €
Fondo ejecutado
22.697,36 €
Fondo pagado
22.697,36 €

Esta ficha organiza los campos que Portugal 2030 publica sobre la operación: financiación aprobada, ejecución administrativa, encuadre y territorio. El mérito de la candidatura y los resultados sobre el terreno no constan en esta fuente.

COMPETE2030-FEDER-00816500

Finalidad de la operación

General Objective: • Induce the silencing of the Rab7 and Ftz-F1H genes in L. vannamei by oral administration of dsRNA-LvRab7-LvFtz-F1H produced in C. reinhardtii. In particularly, it is intended to accomplish the following specific objectives: i) Build a LvRab7-LvFtz-F1H transgene in the dsRNA chloroplast expression vector pLY118 developed in the Purton’s Lab 1 and generation of a C. reinhardtii transformant line expressing dsRNA-LvRab7-LvFtz-F1H using the TN72 2 recipient strain (also generated at Purton’s Lab) . The genotype of this strain will be confirmed by molecular analysis (PCR, sequencing and RT-qPCR) to confirm dsRNA-LvRab7-LvFtz-F1H cassette integration, homoplasmic state, and quantification of dsRNA levels 3. These analyses will be done and validated at CIIMAR and UCL. ii)…

Leer la descripción publicada íntegra

General Objective: • Induce the silencing of the Rab7 and Ftz-F1H genes in L. vannamei by oral administration of dsRNA-LvRab7-LvFtz-F1H produced in C. reinhardtii. In particularly, it is intended to accomplish the following specific objectives: i) Build a LvRab7-LvFtz-F1H transgene in the dsRNA chloroplast expression vector pLY118 developed in the Purton’s Lab 1 and generation of a C. reinhardtii transformant line expressing dsRNA-LvRab7-LvFtz-F1H using the TN72 2 recipient strain (also generated at Purton’s Lab) . The genotype of this strain will be confirmed by molecular analysis (PCR, sequencing and RT-qPCR) to confirm dsRNA-LvRab7-LvFtz-F1H cassette integration, homoplasmic state, and quantification of dsRNA levels 3. These analyses will be done and validated at CIIMAR and UCL. ii) Scale-up the culture of C. reinhardtii expressing dsRNA-LvRab7-LvFtz-F1H to 50 liters using the hanging bag system 4, cell harvest and product recovery 5, including flocculation using chitosan and drying of the biomass of microalgae (spray drying 6) to be used as an oral treatment by mixing it with food (pellet coating). These analyses will be done and validated at UCL. iii) Carry out shrimp feeding and pathogen-challenge tests to verify the silencing of LvRab7 and LvFtz-F1H genes, and the inhibition of replication of V. parahaemolyticus and WSSV (including expression analyses of Argonaute and Dicer shrimp genes by RT-qPCR). These analyses will be done and validated at CIIMAR and CENTEX, respectively. iv) Develop a preliminary risk assessment for the generation of the genetically modified microalgae. Based on the current approach to case-by-case evaluation, this project has also its main objective in identifying the possible risks associated with the use of this technology, both at the level of laboratory tests (off-target gene silencing), as well as making use of bioinformatics tools for the determination of possible non-target organisms in the environment. These analyses will be done at CIIMAR.

Cómo se encuadra la operación

Programa
Programa Inovação e Transição Digital
Fondo
Fundo Europeu de Desenvolvimento Regional
Objetivo estratégico
+ Inteligente
Objetivo específico
Reforçar a investigação, inovação e adoção de tecnologias avançadas.
Área temática
Investigação, Desenvolvimento e Inovação
Actividad económica
Outra investigação e desenvolvimento das ciências físicas e naturais
Modalidad
Subvenção
Tasa de cofinanciación
85%

Distribución territorial publicada

MatosinhosÁrea Metropolitana do Porto · Norte
100% de la localización

Localización observada en el archivo del 31 de octubre de 2026.

Calendario publicado

Inicio previsto
1 de octubre de 2025
Inicio efectivo
7 de abril de 2026
Conclusión prevista
29 de septiembre de 2028
Conclusión efectiva
No indicada

Fuente oficial y fechas de corte

Operación e importes: 31 de octubre de 2026. Localización: 31 de octubre de 2026.

Consultar el portal oficial de Portugal 2030 ↗Capturas validadas por SHA-256; fuente verificada el 18 de noviembre de 2026.