Investigação, Desenvolvimento e Inovação · Em Execução

Produção de dsRNAs direcionados a patógenos virais e bacterianos de camarões utilizando a microalga Chlamydomonas reinhardtii

CIIMAR - CENTRO INTERDISCIPLINAR DE INVESTIGAÇÃO MARINHA E AMBIENTAL

Fund approved
€193,881.60
Fund executed
€22,697.36
Fund paid
€22,697.36

This page sets out the fields Portugal 2030 publishes about the operation: approved funding, administrative execution, framing and territory. The merit of the application and results on the ground are not in this source.

COMPETE2030-FEDER-00816500

Purpose of the operation

General Objective: • Induce the silencing of the Rab7 and Ftz-F1H genes in L. vannamei by oral administration of dsRNA-LvRab7-LvFtz-F1H produced in C. reinhardtii. In particularly, it is intended to accomplish the following specific objectives: i) Build a LvRab7-LvFtz-F1H transgene in the dsRNA chloroplast expression vector pLY118 developed in the Purton’s Lab 1 and generation of a C. reinhardtii transformant line expressing dsRNA-LvRab7-LvFtz-F1H using the TN72 2 recipient strain (also generated at Purton’s Lab) . The genotype of this strain will be confirmed by molecular analysis (PCR, sequencing and RT-qPCR) to confirm dsRNA-LvRab7-LvFtz-F1H cassette integration, homoplasmic state, and quantification of dsRNA levels 3. These analyses will be done and validated at CIIMAR and UCL. ii)…

Read the full published description

General Objective: • Induce the silencing of the Rab7 and Ftz-F1H genes in L. vannamei by oral administration of dsRNA-LvRab7-LvFtz-F1H produced in C. reinhardtii. In particularly, it is intended to accomplish the following specific objectives: i) Build a LvRab7-LvFtz-F1H transgene in the dsRNA chloroplast expression vector pLY118 developed in the Purton’s Lab 1 and generation of a C. reinhardtii transformant line expressing dsRNA-LvRab7-LvFtz-F1H using the TN72 2 recipient strain (also generated at Purton’s Lab) . The genotype of this strain will be confirmed by molecular analysis (PCR, sequencing and RT-qPCR) to confirm dsRNA-LvRab7-LvFtz-F1H cassette integration, homoplasmic state, and quantification of dsRNA levels 3. These analyses will be done and validated at CIIMAR and UCL. ii) Scale-up the culture of C. reinhardtii expressing dsRNA-LvRab7-LvFtz-F1H to 50 liters using the hanging bag system 4, cell harvest and product recovery 5, including flocculation using chitosan and drying of the biomass of microalgae (spray drying 6) to be used as an oral treatment by mixing it with food (pellet coating). These analyses will be done and validated at UCL. iii) Carry out shrimp feeding and pathogen-challenge tests to verify the silencing of LvRab7 and LvFtz-F1H genes, and the inhibition of replication of V. parahaemolyticus and WSSV (including expression analyses of Argonaute and Dicer shrimp genes by RT-qPCR). These analyses will be done and validated at CIIMAR and CENTEX, respectively. iv) Develop a preliminary risk assessment for the generation of the genetically modified microalgae. Based on the current approach to case-by-case evaluation, this project has also its main objective in identifying the possible risks associated with the use of this technology, both at the level of laboratory tests (off-target gene silencing), as well as making use of bioinformatics tools for the determination of possible non-target organisms in the environment. These analyses will be done at CIIMAR.

How the operation is framed

Programme
Programa Inovação e Transição Digital
Fund
Fundo Europeu de Desenvolvimento Regional
Policy objective
+ Inteligente
Specific objective
Reforçar a investigação, inovação e adoção de tecnologias avançadas.
Thematic area
Investigação, Desenvolvimento e Inovação
Economic activity
Outra investigação e desenvolvimento das ciências físicas e naturais
Modality
Subvenção
Co-financing rate
85%

Published territorial distribution

MatosinhosÁrea Metropolitana do Porto · Norte
100% of the location

Location as shown in the file of 31 October 2026.

Published schedule

Planned start
1 October 2025
Actual start
7 April 2026
Planned completion
29 September 2028
Actual completion
Not given

Official source and release dates

Operation and amounts: 31 October 2026. Location: 31 October 2026.