Investigação, Desenvolvimento e Inovação · Em Execução

Desenvolvimento de um sistema térmico de sais fundidos com energia solar acoplado a um reactor termoquímico de biomassa para produção de combustíveis renováveis

UNIVERSIDADE DE ÉVORA

Fund approved
€212,351.76
Fund executed
€0.00
Fund paid
€21,235.18

This page sets out the fields Portugal 2030 publishes about the operation: approved funding, administrative execution, framing and territory. The merit of the application and results on the ground are not in this source.

COMPETE2030-FEDER-00813700

Purpose of the operation

SALBIOFUEL has the following specific objectives (SO): SO.1 - Design and simulation of a molten salt solar-driven olive pomace wastewater hidrothermal liquefaction and steam-reforming process; SO.2 - Lab-scale design and demonstration of a reactor suitable for both processes; SO.3 - Development of engineering project for a full pilot-project demonstration at EMSP-NEWSOL loop; SO.4 - Development of a preliminary techno-economic analysis and scale-up strategy.

How the operation is framed

Programme
Programa Inovação e Transição Digital
Fund
Fundo Europeu de Desenvolvimento Regional
Policy objective
+ Inteligente
Specific objective
Reforçar a investigação, inovação e adoção de tecnologias avançadas.
Thematic area
Investigação, Desenvolvimento e Inovação
Economic activity
Atividades de investigação
Modality
Subvenção
Co-financing rate
85%

Published territorial distribution

ÉvoraAlentejo Central · Alentejo
100% of the location

Location as shown in the file of 31 October 2026.

Published schedule

Planned start
9 October 2025
Actual start
24 March 2026
Planned completion
23 September 2028
Actual completion
Not given

Official source and release dates

Operation and amounts: 31 October 2026. Location: 31 October 2026.

View the official Portugal 2030 portal ↗Captures validated by SHA-256; source checked on 18 November 2026.