Investigação, Desenvolvimento e Inovação · Aceite pela Entidade

Sistema Multi-modal de Imagiologia de raios-X Espetral para aplicação Pré-clínica

UNIVERSIDADE DE AVEIRO

Fund approved
€211,140.00
Fund executed
€0.00
Fund paid
€0.00

This page sets out the fields Portugal 2030 publishes about the operation: approved funding, administrative execution, framing and territory. The merit of the application and results on the ground are not in this source.

COMPETE2030-FEDER-00785100

Purpose of the operation

'== General Objectives == This project aims to develop a Spectral X-ray Imaging system with a Technology Readiness Level (TRL) 5, taking advantage of MicroPatterned Gaseous Detectors (MPGDs) distinctive properties to provide true spectral images. This R&D challenge is pioneering which confers a unique innovative nature to this project. Therefore, a multi-modality spectral imaging system, low-cost, and portable will be developed using ceramic gaseous detectors for full-body small-animal imaging, which includes: > design and develop the ceramic detector with adequate active area, energy resolution (ER), spatial resolution (SR), granularity, count rate and stability > implement the imaging system, mechanically aligned and able to provide adequate sensitivity, SR and ER = Specific Objectives =…

Read the full published description

'== General Objectives == This project aims to develop a Spectral X-ray Imaging system with a Technology Readiness Level (TRL) 5, taking advantage of MicroPatterned Gaseous Detectors (MPGDs) distinctive properties to provide true spectral images. This R&D challenge is pioneering which confers a unique innovative nature to this project. Therefore, a multi-modality spectral imaging system, low-cost, and portable will be developed using ceramic gaseous detectors for full-body small-animal imaging, which includes: > design and develop the ceramic detector with adequate active area, energy resolution (ER), spatial resolution (SR), granularity, count rate and stability > implement the imaging system, mechanically aligned and able to provide adequate sensitivity, SR and ER = Specific Objectives = To achieve the main goal, it is intended to: 1. Develop a portable detection system prototype with a limiting SR of 100 micron, ER ~ 7% (FWHM at 35keV) and detection efficiency ~50% for 35keV. Besides biomedical imaging, it can find applications in other fields, such as surgical specimens imaging, biology, anthropology or industry. 2. Develop an effective gas purification system to maintain gas purity (> 99%) along time without significant maintenance, to improve portability and reduce the costs 3. Develop a dedicated portable electronic system for detector bias and readout. This challenging step will allow portability 4. Develop a robust mechanical system: to support the X-ray shielding camera; and to provide sample motion with precision below the mm scale (granting artifacts-free images) 5. Develop an integrated user-friendly software to: control the operation conditions and data acquisition of/from the system; analyse data and reconstruct images; explore and analyse spectral and morphological information 6. Deepen spectral imaging knowledge: data interpretation is a strong innovative point, which requires a deep understanding of the physical processes. Combine different types of information to show, e.g., composition superimposed to the structure 7. Deepen the knowledge of physics, electronics and instrumentation associated with gaseous detectors, radiation physics and imaging, through simulations and experimental work.

How the operation is framed

Programme
Programa Inovação e Transição Digital
Fund
Fundo Europeu de Desenvolvimento Regional
Policy objective
+ Inteligente
Specific objective
Reforçar a investigação, inovação e adoção de tecnologias avançadas.
Thematic area
Investigação, Desenvolvimento e Inovação
Economic activity
Outra investigação e desenvolvimento das ciências físicas e naturais
Modality
Subvenção
Co-financing rate
85%

Published territorial distribution

AveiroRegião de Aveiro · Centro
100% of the location

Location as shown in the file of 31 October 2026.

Published schedule

Planned start
1 October 2025
Actual start
Not given
Planned completion
29 September 2028
Actual completion
Not given

Official source and release dates

Operation and amounts: 31 October 2026. Location: 31 October 2026.

View the official Portugal 2030 portal ↗Captures validated by SHA-256; source checked on 18 November 2026.