Investigação, Desenvolvimento e Inovação · Em Execução

Engenharia Refratária para o Dimensionamento de Revestimentos de Alvenaria Baseado em Conhecimento

UNIVERSIDADE DO MINHO

Fund approved
€212,241.60
Fund executed
€0.00
Fund paid
€0.00

This page sets out the fields Portugal 2030 publishes about the operation: approved funding, administrative execution, framing and territory. The merit of the application and results on the ground are not in this source.

COMPETE2030-FEDER-00743400

Purpose of the operation

The proposed REFINED project adopts a systematic research and development approach to achieve its overarching objectives: a) Provide essential tools for developing and implementing a robust framework for sustainable refractory lining design, addressing the pressing need for longer-lasting and environmentally friendly solutions in steel production. b) Support European refractory and steelmaking industries in identifying technological advancements by offering high-performance design tools to enhance their competitiveness in the global market. REFINED project brings significant added value through: a) Implementation of advanced constitutive models within commercial software, enabling precise simulation of refractory behaviour and facilitating informed design decisions. Even though…

Read the full published description

The proposed REFINED project adopts a systematic research and development approach to achieve its overarching objectives: a) Provide essential tools for developing and implementing a robust framework for sustainable refractory lining design, addressing the pressing need for longer-lasting and environmentally friendly solutions in steel production. b) Support European refractory and steelmaking industries in identifying technological advancements by offering high-performance design tools to enhance their competitiveness in the global market. REFINED project brings significant added value through: a) Implementation of advanced constitutive models within commercial software, enabling precise simulation of refractory behaviour and facilitating informed design decisions. Even though considerable advances were made within ATHOR, it was highlighted that additional efforts were needed, considering the different phenomenon at play. b) Integration of artificial intelligence and optimization algorithms to predict thermomechanical responses of refractory masonry, optimizing performance and durability. Although some minor efforts have been made recently, current practice relies on small databases and data from incidental process control monitoring and numerical studies instead of continuous in-situ monitoring. c) Benchmarking different behaviour prediction tools through various modelling approaches and advanced analytics, ensuring accuracy and reliability in predicting refractory performance. The validation and comparison of different predictive approaches using case-studies will be crucial to access the capabilities and limitations of the different approaches under the scope of REFINED. d) Provision of validated and benchmarked design framework based on offline and contactless tools for refractory behaviour, crucial for informing downtime planning, process optimization, minimizing process interruptions and enhancing operational efficiency within steel production facilities. Connecting these predictive models to a prosses model within a production facility would be the ultimate goal within REFINED. To accomplish these objectives, the project outlines a series of individual tasks meticulously designed to address specific challenges and advance the state-of-the-art in refractory engineering and design.

How the operation is framed

Programme
Programa Inovação e Transição Digital
Fund
Fundo Europeu de Desenvolvimento Regional
Policy objective
+ Inteligente
Specific objective
Reforçar a investigação, inovação e adoção de tecnologias avançadas.
Thematic area
Investigação, Desenvolvimento e Inovação
Economic activity
Atividades de investigação
Modality
Subvenção
Co-financing rate
85%

Published territorial distribution

GuimarãesAve · Norte
100% of the location

Location as shown in the file of 31 October 2026.

Published schedule

Planned start
1 October 2025
Actual start
24 July 2026
Planned completion
29 September 2028
Actual completion
Not given

Official source and release dates

Operation and amounts: 31 October 2026. Location: 31 October 2026.

View the official Portugal 2030 portal ↗Captures validated by SHA-256; source checked on 18 November 2026.