Purpose of the operation
The action/operation targeted by this application is the requalification of the Bunheiro Riverfront, in an area that extends along Avenida D. Júlio Tavares Rebimbas, between Rua do Lavadouro, to the north, and Rua do Caminho da Igreja, to the south. The operation has the specific objective of protecting nature and biodiversity, qualifying an interface space between the natural system and the urban system and, thus, contributing to the dual challenge of (i) protecting and restoring biodiversity, fundamental to the balance of the Ria de Aveiro ecosystem and (ii) resilience of the territory and consequently of the local community.
How the operation is framed
- Programme
- Programa Regional do Centro
- Fund
- Fundo Europeu de Desenvolvimento Regional
- Policy objective
- + Verde
- Specific objective
- Proteger e preservar a natureza, a biodiversidade e os espaços verdes, inclusive nas zonas urbanas.
- Thematic area
- Ambiente
- Economic activity
- Outras actividades especializadas de construção diversas, n.e.
- Modality
- Subvenção
- Co-financing rate
- 85%
Published territorial distribution
Location as shown in the file of 31 October 2026.
Published schedule
- Planned start
- 14 July 2023
- Actual start
- 14 July 2023
- Planned completion
- 30 June 2026
- Actual completion
- Not given