Investigação, Desenvolvimento e Inovação · Aprovada

SCAL-E-CHARGE: Scalable Megawatt Charging Infrastructure for Electric Vehicles and Heavy-Duty Trucks

ISKRAEMECO PORTUGAL, LDA

Fondo aprobado
3.876.777,35 €
Fondo ejecutado
0,00 €
Fondo pagado
0,00 €

Esta ficha organiza los campos que Portugal 2030 publica sobre la operación: financiación aprobada, ejecución administrativa, encuadre y territorio. El mérito de la candidatura y los resultados sobre el terreno no constan en esta fuente.

COMPETE2030-FEDER-04081300

Finalidad de la operación

SCAL-E-CHARGE aims to accelerate the transition from pre-industrial feasibility to industrial deployment and market uptake of an integrated megawatt-scale charging hub for heavy-duty e-mobility, through an R&D-led operation focused on higher TRLs and complemented by an Innovative Productive Investment (IPI) that enables productization, pilot deployment and replication. The operation is designed to progress from an initial maturity level consistent with TRL 4 to a final TRL 8–9, prioritizing experimental development, system integration, industrialisation and validation in relevant operational environments. Strategic objectives: 1) Develop and industrialize critical clean technologies for heavy-duty charging infrastructure, integrating grid-interface and protection architecture, high-power…

Leer la descripción publicada íntegra

SCAL-E-CHARGE aims to accelerate the transition from pre-industrial feasibility to industrial deployment and market uptake of an integrated megawatt-scale charging hub for heavy-duty e-mobility, through an R&D-led operation focused on higher TRLs and complemented by an Innovative Productive Investment (IPI) that enables productization, pilot deployment and replication. The operation is designed to progress from an initial maturity level consistent with TRL 4 to a final TRL 8–9, prioritizing experimental development, system integration, industrialisation and validation in relevant operational environments. Strategic objectives: 1) Develop and industrialize critical clean technologies for heavy-duty charging infrastructure, integrating grid-interface and protection architecture, high-power conversion, embedded energy storage and digital/AI operational layers into a single deployable system. 2) Strengthen and safeguard EU value chains associated with megawatt charging infrastructure by consolidating engineering, system integration, assembly/validation and software capabilities within the consortium, reducing reliance on fragmented multi-vendor deployments and non-EU controlled operational platforms in critical infrastructure contexts. 3) Enable scalable roll-out across the EU internal market through a modular, standardized and replicable architecture supported by a system design tool that reduces site-specific engineering effort and accelerates deployment timelines. 4) Demonstrate full value-chain validation by executing a first-of-a-kind pilot hub in a real industrial/logistics context, generating technical evidence that supports exploitation beyond a single site and reduces residual adoption risk. Scientific and technological objectives (DL-driven, specific, measurable): DL1–DL3 (MegaWatt HUB core hardware: distribution, power unit, dispensers): - Design and validate an integrated electrical ecosystem comprising the Power Distribution Panel (DL1), the Power Unit (DL2) and the Depot Dispenser (DL3), engineered for megawatt-level operation and industrial deployment. - Achieve a nominal hub power = 1.2 MW, validated under relevant load profiles, with a base configuration supporting = 10 simultaneous charging interfaces, and scalable expansion to > 20 charging points without redesigning the electrical core (modular/stackable concept). - Ensure system-level conversion and delivery efficiency = 96% and deliver dispensers covering mid-power operation (= 400 kW) and ultra-high-power operation (> 1.2 MW), compatible with emerging heavy-duty charging requirements. - Validate grid-integrated operation through appropriate upstream electrical architecture, protection coordination and control strategies suitable for constrained grid environments. DL2 (embedded storage integration within the DC link): - Integrate energy storage within the DC bus to enable peak shaving/load smoothing and improve operational flexibility, targeting round-trip efficiency close to 94%, improving on typical benchmark performance referenced in the technical annex (TA). DL4 (AI Predictive Maintenance System): Develop and validate an AI-enabled monitoring and predictive maintenance layer, including data architecture, sensor integration and predictive models, targeting minimum HUB availability of 95% and actionable maintenance outputs aligned with real operational workflows. DL5 (System Design Tool): Develop a digital tool to automate electrical design and configuration of

Cómo se encuadra la operación

Programa
Programa Inovação e Transição Digital
Fondo
Fundo Europeu de Desenvolvimento Regional
Objetivo estratégico
+ Verde
Objetivo específico
Tecnologias limpas
Área temática
Investigação, Desenvolvimento e Inovação
Actividad económica
Actividades de engenharia e técnicas afins
Modalidad
Subvenção
Tasa de cofinanciación
59.14%

Distribución territorial publicada

PortoÁrea Metropolitana do Porto · Norte
7.7669% de la localización
MatosinhosÁrea Metropolitana do Porto · Norte
5.4016% de la localización
BragaCávado · Norte
6.4904% de la localización
MaiaÁrea Metropolitana do Porto · Norte
80.3411% de la localización

Localización observada en el archivo del 31 de octubre de 2026.

Calendario publicado

Inicio previsto
1 de julio de 2026
Inicio efectivo
No indicada
Conclusión prevista
31 de diciembre de 2028
Conclusión efectiva
No indicada

Fuente oficial y fechas de corte

Operación e importes: 31 de octubre de 2026. Localización: 31 de octubre de 2026.

Consultar el portal oficial de Portugal 2030 ↗Capturas validadas por SHA-256; fuente verificada el 18 de noviembre de 2026.