Investigação, Desenvolvimento e Inovação · Em Execução

Soluções em betão com metaestruturas embebidas para mitigação de ruído ferroviário

UNIVERSIDADE DE COIMBRA

Fondo aprobado
211.654,08 €
Fondo ejecutado
25.029,82 €
Fondo pagado
25.029,82 €

Esta ficha organiza los campos que Portugal 2030 publica sobre la operación: financiación aprobada, ejecución administrativa, encuadre y territorio. El mérito de la candidatura y los resultados sobre el terreno no constan en esta fuente.

COMPETE2030-FEDER-00917500

Finalidad de la operación

The following objectives for the current project are established: 1) Provide deeper insight on the Metaporous concrete concept with embedded resonant structures, understanding each part of the hybrid acoustic material and its applicability Several works exist regarding porous concrete solutions for sound absorptive treatment. However, these solutions exhibit reduced sound absorption efficiency at certain ranges of the frequency domain. Some very recent studies by the research team presented the Metaporous solution concept, which will be further investigated with the incorporation of complex resonant structures embedded in porous absorptive material. It is essential for the scientific and technical communities to have solid information on the behaviour of such structures in order to promote…

Leer la descripción publicada íntegra

The following objectives for the current project are established: 1) Provide deeper insight on the Metaporous concrete concept with embedded resonant structures, understanding each part of the hybrid acoustic material and its applicability Several works exist regarding porous concrete solutions for sound absorptive treatment. However, these solutions exhibit reduced sound absorption efficiency at certain ranges of the frequency domain. Some very recent studies by the research team presented the Metaporous solution concept, which will be further investigated with the incorporation of complex resonant structures embedded in porous absorptive material. It is essential for the scientific and technical communities to have solid information on the behaviour of such structures in order to promote their application in practice. 2) Development and validation of innovative solution based on the Metaporous concrete concept for railway passive noise control applications There is a need to design new acoustic metamaterial solutions, with both high durability and high sound absorption properties at the dominant frequencies of railway noise. In fact, the extension to the civil engineering field requires novel metamaterials and innovative noise control devices, designed, for example, for railway track environments, underground train stations and tunnels. The development of adequate numerical tools is crucial for this purpose, as well as their validation, and further experimental activities to verify the performance of the proposed concepts. 3) Provide technical information on the new acoustic concepts for the technical and scientific communities In order to make the developed solutions accessible for practical application, technical information will be prepared, disseminated and validated with the scientific community, allowing the technical community to implement the proposed solutions in practical scenarios (open and closed acoustic railway environments).

Cómo se encuadra la operación

Programa
Programa Inovação e Transição Digital
Fondo
Fundo Europeu de Desenvolvimento Regional
Objetivo estratégico
+ Inteligente
Objetivo específico
Reforçar a investigação, inovação e adoção de tecnologias avançadas.
Área temática
Investigação, Desenvolvimento e Inovação
Actividad económica
Outra investigação e desenvolvimento das ciências físicas e naturais
Modalidad
Subvenção
Tasa de cofinanciación
85%

Distribución territorial publicada

PortoÁrea Metropolitana do Porto · Norte
25.7634% de la localización
CoimbraRegião de Coimbra · Centro
74.2366% de la localización

Localización observada en el archivo del 31 de octubre de 2026.

Calendario publicado

Inicio previsto
1 de julio de 2025
Inicio efectivo
26 de mayo de 2026
Conclusión prevista
29 de junio de 2028
Conclusión efectiva
No indicada

Fuente oficial y fechas de corte

Operación e importes: 31 de octubre de 2026. Localización: 31 de octubre de 2026.

Consultar el portal oficial de Portugal 2030 ↗Capturas validadas por SHA-256; fuente verificada el 18 de noviembre de 2026.