Investigação, Desenvolvimento e Inovação · Em Execução

Avaliação da fibrose do miocárdio por eco-radiómica

UNIVERSIDADE DO PORTO

Fund approved
€212,461.92
Fund executed
€7,995.05
Fund paid
€7,995.05

This page sets out the fields Portugal 2030 publishes about the operation: approved funding, administrative execution, framing and territory. The merit of the application and results on the ground are not in this source.

COMPETE2030-FEDER-00785300

Purpose of the operation

1. To develop a predictive model that quantitatively estimates myocardial fibrosis using echocardiography in animal models and patients. This will be achieved through paired acquisitions of myocardial regions of interest (ROI), from which radiomics will be derived, and histological quantification of percentage fibrosis in colocalised myocardial samples. 2. To assess the role of the echocardiography machine resolution and to compare image acquisitions from standard transthoracic echocardiography (phased-array probe) with epicardial myocardial acquisitions with a high resolution linear-probe in the performance of predictive models. 3. To appraise the added value of pulse-cancellation ultrasound (US) and US contrast administration with harmonic detection settings compared to standard…

Read the full published description

1. To develop a predictive model that quantitatively estimates myocardial fibrosis using echocardiography in animal models and patients. This will be achieved through paired acquisitions of myocardial regions of interest (ROI), from which radiomics will be derived, and histological quantification of percentage fibrosis in colocalised myocardial samples. 2. To assess the role of the echocardiography machine resolution and to compare image acquisitions from standard transthoracic echocardiography (phased-array probe) with epicardial myocardial acquisitions with a high resolution linear-probe in the performance of predictive models. 3. To appraise the added value of pulse-cancellation ultrasound (US) and US contrast administration with harmonic detection settings compared to standard echocardiography settings in these predictive models. This will be achieved by repeated image acquisitions under different conditions in the experimental models. 4. To test various alternatives of image preprocessing before radiomics feature extraction, thereby extending and optimizing the pipeline proposed by Kagiyama et al. [Kagiyama2020]. 5. To develop and share open-source software tools that render semi-automated extraction ROIs from the left ventricle myocardium in images from standard echocardiography views. 6. To develop predictive models that quantitatively estimate myocardial fibrosis through echocardiography-derived radiomics features, using late gadolinium enhancement assessment and extracellular volume quantification by myocardial longitudinal relaxation time mapping (T1 mapping) in cardiac magnetic resonance (CMR) imaging as a gold-standard reference. This objective will be achieved by comparing echocardiography and CMR image acquisitions in patients who underwent both modalities within a narrow time window by retrospectively querying the picture archiving and communication systems of two central hospitals. 7. To validate objective 6 and obtain model performance metrics in a test sample. 8. To make databases accessible online (ensuring anonymisation and ethical issues) as well as the whole data analytics pipeline. 9. To deploy models online and to desktop applications so that researchers and clinicians can upload new examinations and obtain real-time predictions.

How the operation is framed

Programme
Programa Inovação e Transição Digital
Fund
Fundo Europeu de Desenvolvimento Regional
Policy objective
+ Inteligente
Specific objective
Reforçar a investigação, inovação e adoção de tecnologias avançadas.
Thematic area
Investigação, Desenvolvimento e Inovação
Economic activity
Investigação e desenvolvimento em biotecnologia
Modality
Subvenção
Co-financing rate
85%

Published territorial distribution

PortoÁrea Metropolitana do Porto · Norte
100% of the location

Location as shown in the file of 31 October 2026.

Published schedule

Planned start
1 October 2025
Actual start
1 September 2026
Planned completion
29 September 2028
Actual completion
Not given

Official source and release dates

Operation and amounts: 31 October 2026. Location: 31 October 2026.

View the official Portugal 2030 portal ↗Captures validated by SHA-256; source checked on 18 November 2026.